S.No | Description | Length | Project Name |
---|---|---|---|
1 | Fixing and tension of electrical cables (ACSR) dia of 35mm2 | 60Km | Al-Udain Electrical Project, Phase 1 |
2 | Fixing 3 Phase & 1 Phase transformers | N/A | Al-Udain Electrical Project, Phase 2 |
3 | ABC Cables (1*16+16) | 15 Km | Construction of Low Pressure Electrical Net |
4 | ABC Cables (2*16+16) | 09 Km | Construction of Low Pressure Electrical Net |
5 | ABC Cables (*16+16) | 10 Km | Construction of Low Pressure Electrical Net |
6 | ABC Cables (1*5+5) | 05 Km | Construction of Low Pressure Electrical Net |
7 | ABC Cables (3*5+5) | 11 Km | Construction of Low Pressure Electrical Net |
8 | ABC Cables (1*50+50) | 04 Km | Construction of Low Pressure Electrical Net |
9 | Connecting Electrical Station | High Pressure net of Central Udain Electrical station |